Red Head®
Epcon®
Installation

Link to Home PageLink To the Table of ContentsClick here to Contact Smith Fastener
Link to our Showroom LobbyLink to Red Head® Anchors

Red Head® Epcon® A7, C6 and G5 Anchoring Adhesive Installation

Drill proper size hole. Clean out hole from botton with forced air. Complete hole preparation with use of a brush and repeat cleaning with forced air. (leave no dust or slurry). Please, always protect your eyes from flying debris by wearing safety glasses.
When starting new cartridge or nozzle, dispense and discard enough adhesive until a uniform grey color is achieved. insert nozzle into the bottom of the hole and fill to 1/2 the hole depth.
Insert selected rod slowly by hand into the bottom of the hole with a slow twisting motion. This insures the adhesive fills voids and crevises uniformly.
See the respective cure time charts for set-up time. After the recommended cure time is met, install and tighten fixture into place.
Return to Acrylic: Epcon A7 Return to Epoxy: Epcon C6 and Epcon G5

For more information about Red Head® products go to the Red Head® website at:
http://www.itw-ramset.com/

Smith Fastener Company, A California Corporation - 3613 East Florence Avenue, Bell, California, 90201 - Phone: ( 323 ) 587-0382 and ( 800 ) 764-8488 - FAX: ( 323 ) 587-8712 - E-mail: sales@smithfast.com - Copyright © 2000 by Smith Fastener Company - Please report website problems to: WebMaster - Last updated: January 30th, 2004 - http://www.smithfast.com/epconin.htm