Red Head® Epcon® Installation Steps for
A7, C6 and G5

For more information about Red Head® products go to the Red Head® website at:
http://www.itwredhead.com/



Drill proper size hole. Clean out hole from botton with forced air. Complete hole preparation with use of a brush and repeat cleaning with forced air. (leave no dust or slurry). Please, always protect your eyes from flying debris by wearing safety glasses.
When starting new cartridge or nozzle, dispense and discard enough adhesive until a uniform grey color is achieved. insert nozzle into the bottom of the hole and fill to 1/2 the hole depth.
Insert selected rod slowly by hand into the bottom of the hole with a slow twisting motion. This insures the adhesive fills voids and crevises uniformly.
See the respective cure time charts for set-up time. After
the recommended cure time is met, install and tighten
fixture into place.

Return to Acrylic: Epcon A7
Return to Epoxy: Epcon C6 and Epcon G5




Smith Fastener Company • 3613 East Florence Avenue, Bell, California, 90201
Phone: ( 323 ) 587-0382 • FAX: ( 323 ) 587-8712 • E-mail: [email protected]
Copyright © 2009 by Smith Fastener Company

Hitch Pins | Construction/Lifting | Blind Rivets | Dowel Pins | Cotter Pins | Nuts, Bolts, Screws, Washers
Threaded Inserts | Anchors | Pins | Automotive | Weatherhead Pipe Fittings | Cutting Tools